Skip to content

Conversation

elbachir-one
Copy link
Contributor

Testing the changes

  • I tested the changes in this PR: YES

New package

Local build testing

  • I built this PR locally for my native architecture, (ARCH-LIBC)
  • I built this PR locally for these architectures (if supported. mark crossbuilds):
    • aarch64-musl
    • armv7l
    • armv6l-musl

@classabbyamp classabbyamp added the new-package This PR adds a new package label Dec 8, 2024
Copy link

github-actions bot commented Mar 9, 2025

Pull Requests become stale 90 days after last activity and are closed 14 days after that. If this pull request is still relevant bump it or assign it.

@github-actions github-actions bot added the Stale label Mar 9, 2025
@elbachir-one elbachir-one changed the title New package: gowall-0.1.9 New package: gowall-0.2.0 Mar 10, 2025
@github-actions github-actions bot removed the Stale label Mar 11, 2025
@elbachir-one elbachir-one changed the title New package: gowall-0.2.0 New package: gowall-0.2.1 Apr 12, 2025
@the-maldridge the-maldridge merged commit da706f3 into void-linux:master Aug 29, 2025
8 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
new-package This PR adds a new package
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants